IWA 33-3:2021
p
IWA 33-3:2021
82192
недоступно на русском языке

Тезис

 Preview

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.


Общая информация 

  •  : Опубликовано
     : 2021-03
  •  : 1
  •  : ISO/TMBG Technical Management Board - groups
  •  :
    27.140 Hydraulic energy engineering

Приобрести данный стандарт

ru
Формат Язык
std 1 187 PDF + ePub
std 2 187 Бумажный
  • CHF187

Жизненный цикл

Появились вопросы?

Ознакомьтесь с FAQ

Работа с клиентами
+41 22 749 08 88

Часы работы:
Понедельник – пятница: 09:00-12:00, 14:00-17:00 (UTC+1)