About
-
Secretariat: ANSI (United States)
Committee Manager: -
Chairperson (until end 2027):Mr George Langton
-
ISO Technical Programme Manager [TPM]:ISO Editorial Manager [EM]:
- Creation date: 1988
Scope
Standardization in the field of all aspects of gas turbine design, application, safety, installation, operation and maintenance, including simple turbine cycles, combined cycle systems, definitions, procurement, acceptance, performance, environment (on the gas turbine itself and the external environment) and methods of test.
The standardization considers the gas turbines are implemented in support of the renewable “landscape”, to compensate for the fluctuations of renewable energy productions.
Standardization also considers that gas turbine technology operates using a wide range of gaseous and liquid fuels.ISO / TC 192 is responsible for preparing horizontal standards for all types of gas turbines. Work on aero gas turbine engines shall be undertaken in liaison with those technical committees having the primary responsibility.
Note:
ISO / TC 20 has the primary responsibility of preparing standards relative to the specific application of gas turbines to aerospace.
Quick links
-
Work programme
Drafts and new work items -
Business plans
TC Business plans for public review -
Working area
Working documents (user account required) -
ISO Electronic applications
IT Tools that help support the standards development process -
Public material
Browse documents made available by this group
This committee contributes with 25 standards to the following Sustainable Development Goals:
Liaison Committees to ISO/TC 192
The committees below can access the documents of ISO/TC 192:
Liaison Committees from ISO/TC 192
ISO/TC 192 can access the documents of the committees below:
Organizations in liaison (Category A and B)
* Information definite but meeting not yet formally convened
** Provisional
ISO/TC 192 - Secretariat
ANSI (United States)
Washington 20036 DC
United States